Coordinate site work when drawings change

Connect revised drawings to site work, supplier orders, and inspections. Your team can see what needs updating and who needs to act.

Talk to our team
Check how a drawing revision affects site work

Work instructions still reference the old drawing

A revised drawing changes the third-floor ventilation duct route, but the installation instructions, fabrication order, and inspection request still reference the old version. Maintenance access also needs confirmation before the ceiling is closed. These checks are spread across separate documents, making them easy to miss.

Check how a drawing revision affects site work

In the fictional Meridian Build project, compare the latest drawing with work instructions, supplier orders, and inspection requests. The records show which east-zone work needs review and which west-zone work is outside the change.

Drawing changes

Comparing drawing versions and change notes shows what has changed.

Design decisions

Design questions and responses record what was agreed and approved.

Affected work and orders

Links to site tasks and supplier orders identify where the revision needs to be reflected.

Pending checks

Site reports and inspection records show what still needs resolution before work continues.

Check affected work, inspection requirements, and team actions

Find work using the old drawing.

Follow drawing M-204 R4 through the duct section specified for fabrication to order PO-417, work package WP-31, and inspection request IR-28. All three still reference revision R3. The site report identifies the unchanged west-zone work as outside this review.

The review identifies three records that still reference the old drawing.

M-204 R4 changed the duct route. What needs checking before level 3 ceilings close, and what can continue?

Find work using the old drawing.

Work planning, change reviews, and handovers

Work readiness

Review unfinished tasks, pending approvals, and unanswered design questions that could delay the next stage of construction.

Proposed changes

Compare the contract, site records, and cost estimate to understand the scope and basis of a proposed change.

Project handover

Connect installed equipment to as-built drawings, inspection results, and operating instructions to assemble the records the next team needs.

EngramRAG

Drawing revisions and project decisions in one history

EngramRAG connects drawing revisions to the building systems, orders, and work they affect. New replies and inspection results stay linked to those records, so later reviews can build on what the team has already checked.

Drawings and related work

Drawing numbers, locations, building systems, and work packages connect related records.

Current and previous versions

Superseded records remain available and clearly distinct from the current issue.

Decisions for the next team

Responses and agreed decisions stay linked to the work they inform.

Share the records needed to coordinate site work

Bring drawings, project records, and team decisions into one workspace so everyone can review the changes together.